Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorÇabuk, Nihan Saye
dc.contributor.authorBakış, R.
dc.contributor.authorGöncü, S.
dc.contributor.authorGümüşlüoglü, E.
dc.contributor.authorÇabuk, A.
dc.contributor.authorÇabuk, Nihan Saye
dc.contributor.authorBakış, Recep
dc.contributor.authorGöncü, Serdar
dc.contributor.authorGümüşlüoglü, E.
dc.contributor.authorÇabuk, Alper
dc.date.accessioned2019-10-23T17:56:18Z
dc.date.available2019-10-23T17:56:18Z
dc.date.issued2014
dc.identifier.issn1818-4952
dc.identifier.urihttps://dx.doi.org/10.5829/idosi.wasj.2014.32.08.1214
dc.identifier.urihttps://hdl.handle.net/11421/22912
dc.description.abstractThe most important renewable energy source in Turkey is the hydropower. Turkey's geographical location provides important advantages for extensive use of hydropower energy sources. There are many available streams in the country for energy generation, which are mostly unexploited at the moment. Besides, electricity demand has recently increased significantly due to extensive energy use in the country. However, the required energy is mostly imported from foreign countries since it cannot be met by Turkey's own resources. In this paper, the hydropower potential of Şemdinli River, which is a subbasin of Zab Basin, is investigated. During the study, Geographic Information Systems (GIS) and Remote Sensing (RS) methods were utilized. According to preliminary research, one dam was planned in the Şemdinli River Basin. The possible costs of this dam and the estimated amount of annual electric energy were also calculated. For the calculations of the total costs and the total installed power capacity of the dam, Simahpp software was used. Accordingly, the total cost, installed power capacity and total annual electricity of the dam were respectively found as 61,716×106 US$, 42,813 MW and 78,76 GWhen_US
dc.language.isoengen_US
dc.publisherInternational Digital Organization for Scientific Informationen_US
dc.relation.isversionof10.5829/idosi.wasj.2014.32.08.1214en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectDam Planningen_US
dc.subjectElectricity Generationen_US
dc.subjectHydropower Plantsen_US
dc.subjectWater Potentialen_US
dc.subjectŞemdinli River Basinen_US
dc.titleInvestigation of hydropower potential of Şemdinli River Basinen_US
dc.typearticleen_US
dc.relation.journalWorld Applied Sciences Journalen_US
dc.contributor.departmentAnadolu Üniversitesi, Yer ve Uzay Bilimleri Enstitüsüen_US
dc.identifier.volume32en_US
dc.identifier.issue8en_US
dc.identifier.startpage1731en_US
dc.identifier.endpage1737en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US]
dc.contributor.institutionauthorÇabuk, Nihan Saye
dc.contributor.institutionauthorBakış, Recep
dc.contributor.institutionauthorGöncü, Serdar
dc.contributor.institutionauthorÇabuk, Alper


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster