Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorSavsar, Mehmet
dc.contributor.authorBiles, William, E.
dc.date.accessioned2019-10-21T20:41:48Z
dc.date.available2019-10-21T20:41:48Z
dc.date.issued1984
dc.identifier.urihttps://hdl.handle.net/11421/20884
dc.descriptionInst of Industrial Engineers, Norcross, GA, USA;AIIE, Norcross, GA, USAen_US
dc.description1984 Annual International Industrial Engineering Conference. -- -- Chicago, IL, USA -- 5312en_US
dc.description.abstractReliability and productivity calculations for multi-stage production flow lines with intermediate storage units are extremely complex. When scheduled maintenance is performed on production machines, the resulting models defy analytical solution. This paper describes a computer simulation approach to estimating line productivity and the effect of storage unit capacity. The simulation program utilizes a mathematical model and statistical procedures for testing the reliability of simulation results.en_US
dc.language.isoengen_US
dc.publisherIndustrial Engineering & Management Press (Order n 257), Norcross, GA, USAen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.titleSIMULATION MODEL FOR AUTOMATED MULTI-STAGE PRODUCTION LINES.en_US
dc.typeconferenceObjecten_US
dc.contributor.departmentAnadolu Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.identifier.startpage517en_US
dc.identifier.endpage525en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US]


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster